Finally was able to check off chapter 31 after remaking the right fuel line two more times. Also put the last couple rivets in chapter 32, which was the baggage area floor and side panels.
View attachment 149514View attachment 149515
Now on chapter 33, which is the rudder pedals, cables, and brakes. Unfortunately, I can't do most of it because the rudder pedals/ bars are backordered. The rudder pedals are adjustable, so they can go in later. I did run the cables, part of which involves installing 4 Adel clamps underneath the fuel selector to secure a guide tube. That was the worst job I've done so far. It would've been easy before all the fuel stuff went in, and I see no reason why it couldn't have been done first. Irritating.
Anyway, 33 will be done soon; 34 is the flap actuation system. Andddd, the flap motor is backordered, so I won't be able to do much of that either.
I'm nearly done with this kit. I'm not sure i can afford the finishing kit at the moment though. Also, the engine mount is backordered anyway. Van's mentioned that they were trying to move their steel parts fabrication in house... im concerned the engine mount and rudder pedals are casualties of that. The rudder pedals i think i could make, but I'm not brave enough to try my own engine mount. I hear the canopy takes a long time, but i don't want to do that until we have some warmer weather for drilling acrylic and curing fiberglass. I guess I'll concentrate on wiring and see if I can get some kind of timeline on the steel parts.