I asked because I’ve been flying from the right seat now in preparation for my CFI Checkride.Have never thought of that. My guess is that would not be available, in that the AP unit probably was never built to interpret two different commands from two controllers. Also begs the question of what should the appropriate response of the trim system be in that situation?
I asked because I’ve been flying from the right seat now in preparation for my CFI Checkride.
I’m only wanting it for myself when I fly solo from the right seat. LolSerious question. What scenario do you envision needing to intervene with a student using only electric trim?
In that scenario are there alternate interventions that can achieve the same outcome?
Hey,That’s pretty much what I got, except I went with a Garmin audio panel and it’s recommended to go with a G5 with the G3X vs the 275. Also, EIS with your G3X and a GTX345R (remote mounted). Exciting!!
It isn’t anything close to 445hrs, shop around. My final bill came in at 151hrs. You can reach out to the guys who did mine. They do great work.
We're about to start a similar scope of work, plus completely replacing every circuit breaker and panel switch from the subpanel, and our quote is for 300 hours. 445 sounds rich.I just had a completely new panel installed, ripping out everything I previously had, including my manual trim and installing electric trim.
I already had a GTN 650, but everything else was new and needed installed/wired. I did a G3X system:
- GDU 460
- G5
- GSU 25
- GMU 11
- GEA
- GTR 205x (remote com 2)
- GMA 245
- GMC 507
- 2x GSA 28
- GAD 27
- GAD 29
- GTX 45R
- GTP 59
Total was around 150 hours of labor.
I've been considering a panel upgrade from a while now on my turbo arrow and am curious on the typical amount of hours of labor required to install the following:
-G3X
-GTX 345
-GTR 205
-GI 275
-PMA 450b
-GFC 500 w/ pitch trim
I am currently waiting on a couple of quotes to come in and just want to make sure they aren't inflated. I have a quote for a similar setup from back in 2022 and it was around 445hrs for the install which seems pretty high
We're about to start a similar scope of work, plus completely replacing every circuit breaker and panel switch from the subpanel, and our quote is for 300 hours. 445 sounds rich.
What are you using to drive the GFC500? We're doing a soup-to-nuts full rewiring of the airplane. CIES fuel senders, GEA24 w/new probes, fuel flow transducer, etc., plus a TCW battery backup system. Just properly configuring and testing everything will likely take 30 hours.300 sounds rich, 445 is insane.
I had G3X (and associated boxes like GDL50R, 29B, etc), GFC500, AV20, all switches and entire panel redesigned including circuit breaker panel for a 100 hours.
What are you using to drive the GFC500? We're doing a soup-to-nuts full rewiring of the airplane. CIES fuel senders, GEA24 w/new probes, fuel flow transducer, etc., plus a TCW battery backup system. Just properly configuring and testing everything will likely take 30 hours.
I'm completely happy with my GI275 GI 275 G500 setup....There is rarely something like a „similar“ set-up in the avionic world.
It is not unusual to see garden variety in the estimated hours. Same is true for panel cutting or harnesses.
Not sure if this proposed set-up makes really sense. G3X with a/p but no GPS navigator is highly unusual. If there is already one in place, the integration will take a few hours.
Reconsider the GI275. GI275 and GFC500 do not play as nice together as the G5 / GFC500 combo.