Beatle1967
Filing Flight Plan
- Joined
- Oct 26, 2019
- Messages
- 12
- Display Name
Display name:
Beatle1967
Hello,
I'm a CFI teaching in the SF Bay Area, mostly ab initio airplane students, but I also have a few instrument students. While doing some lesson prep this afternoon I was looking at the LVK LOC RWY 25R approach (I would include a link, but new members are prevented from doing so because of spam). My understanding is this- if equipment is required for the final approach segment to be flown, it is included in the title. In this case, the final approach segment has named step-down fixes HINIX & ZABGO identified by DME from the localizer, and unnamed fixes identified by DME, including the MAP at I-LVK 1nm.
In the notes section the chart says "DME required". My question- why not in the chart title?
Thanks,
Beatle
I'm a CFI teaching in the SF Bay Area, mostly ab initio airplane students, but I also have a few instrument students. While doing some lesson prep this afternoon I was looking at the LVK LOC RWY 25R approach (I would include a link, but new members are prevented from doing so because of spam). My understanding is this- if equipment is required for the final approach segment to be flown, it is included in the title. In this case, the final approach segment has named step-down fixes HINIX & ZABGO identified by DME from the localizer, and unnamed fixes identified by DME, including the MAP at I-LVK 1nm.
In the notes section the chart says "DME required". My question- why not in the chart title?
Thanks,
Beatle