The Comanche has been a great plane. Other than routine maintenance and the upgrades I voluntarily installed it has been great. This year however, it'll be an expensive plane :-( Three major items are due:
1. 1,000 hour gear ad: Quoted at $4,000 - $5,000.
2. 5 year stab horn ad: Quoted at $4,000 - $5,000.
3. 10 year prop overhaul: Quoted at $4,000.
The prop overhaul is the dumbest. All shops ask me, why don't I just IRAN the prop for less than half the cost - but I can't. It's a Canadian mandate and since the plane is still C-registered, I have to do it. Oh, and then on top of the above mandated items, I will also have to fly 6 hours one way to get the annual done because a U.S. mechanic is not allowed to sign off on an annual for a Canadian registered plane and I have not found a licensed Canadian mechanic in the U.S. yet (and doubt I will). I was considering to just go through the import process this year while taking care of the above items, which would also eliminate the mandatory prop overhaul but from what I've heard, that's a loooong process and I don't want the plane being grounded for that long. At least the above items won't take long (at least not estimated). The shop that's doing the gear and stab horn said I should be in and out within a week. The prop shop said 1-2 weeks and my annuals usually take 3 days.
1. 1,000 hour gear ad: Quoted at $4,000 - $5,000.
2. 5 year stab horn ad: Quoted at $4,000 - $5,000.
3. 10 year prop overhaul: Quoted at $4,000.
The prop overhaul is the dumbest. All shops ask me, why don't I just IRAN the prop for less than half the cost - but I can't. It's a Canadian mandate and since the plane is still C-registered, I have to do it. Oh, and then on top of the above mandated items, I will also have to fly 6 hours one way to get the annual done because a U.S. mechanic is not allowed to sign off on an annual for a Canadian registered plane and I have not found a licensed Canadian mechanic in the U.S. yet (and doubt I will). I was considering to just go through the import process this year while taking care of the above items, which would also eliminate the mandatory prop overhaul but from what I've heard, that's a loooong process and I don't want the plane being grounded for that long. At least the above items won't take long (at least not estimated). The shop that's doing the gear and stab horn said I should be in and out within a week. The prop shop said 1-2 weeks and my annuals usually take 3 days.