The
Douglas DC-8 (sometimes
McDonnell Douglas DC-8) is an early long-range
narrow-body jetliner designed and produced by the American
Douglas Aircraft Company.
Work began in 1952 towards the
United States Air Force's (USAF) requirement for a jet-powered
aerial refueling tanker. After losing the USAF's tanker competition to the rival
Boeing KC-135 Stratotanker in May 1954,
Douglas announced in June 1955 its derived jetliner project marketed to civil operators.
In October 1955,
Pan Am made the first order along with the competing
Boeing 707, and many other airlines soon followed.
The first DC-8 was rolled out in Long Beach Airport on April 9, 1958, and flew for the first time on May 30. Following
Federal Aviation Administration (FAA)
certification in August 1959, the DC-8 entered service with
Delta Air Lines on September 18.
In your quote it refers to the Series 60. By the time that version flew the design was already 11 years old.
As far as the 777X,
en.wikipedia.org
2021
In January 2021, Boeing expected to add two more 777-9s to the test program, aiming for certification in 2021.The delay was due to updated
type certification requirements and the
impact of the COVID-19 pandemic on aviation, costing a $6.5 billion charge.
On June 27, 2021,
The Seattle Times reported on an FAA letter to Boeing dated May 13 delaying type certification until mid to late 2023, pushing deliveries to 2024. The FAA cited a serious test flight incident involving an "uncommanded pitch event" and a lack of "design maturity".
2022–2024
In April 2022, after an "updated assessment of the time required to meet certification requirements", Boeing again delayed 777X deliveries, this time to 2025. In November 2022, it was revealed that the GE9X engine on one of the four test 777-9s had suffered a technical issue on October 6. Boeing subsequently paused the test program while GE investigated the issue.
In May 2024, launch customer
Lufthansa was expecting its first deliveries in 2026.
In August 2024, routine inspection following a test flight in Hawaii led to Boeing grounding its 777X test fleet. A structural link between the engine and wing was found to be damaged, while cracks were found in the same component on other aircraft in the fleet.
On October 11, 2024, Boeing confirmed that the expected first delivery of the aircraft had slipped to 2026, following development challenges and workplace strikes at the company. Emirates cast doubt on this forecast, noting that Boeing had no clear timeline for resuming certification flights.