- Joined
- Mar 2, 2005
- Messages
- 16,628
- Location
- Southeast Tennessee
- Display Name
- This page intentionally left blank
Argh, First article inspections. And people wonder why hammers cost $5k.
ARGH!
ARGH!
Aren't they fun? We have to check every dimension shown on the drawing, for each cavity. Doesn't sound too bad, but sometimes i have 32 cavities to check. All must be in tolerance, plus the Cpk anakysis must be in. Or start over . . .
Aren't they fun? We have to check every dimension shown on the drawing, for each cavity. Doesn't sound too bad, but sometimes i have 32 cavities to check. All must be in tolerance, plus the Cpk anakysis must be in. Or start over . . .
Argh, First article inspections. And people wonder why hammers cost $5k.
ARGH!