So my 92zk prop was due for 500 hour AD, and got a quote for 1.8k. Sent in, the prop shop told me the bearings are corroded, so have to replace that. Then when I got my invoice, it turned into an overhaul with the bearing replaced.
So suppose to 1.8k +0.4k(bearings) now its 2.8k(overhaul)+0.4K(bearings)
Prop was overhauled 7 years ago 500SMOH.
Is this normal? ( when inspecting prop and a lot more problem shows up and require an overhaul?) is there anything that IRAN can’t fix?
Or is my service being upgraded without my permission?
I told them “Only do 500AD” when I sent in
So suppose to 1.8k +0.4k(bearings) now its 2.8k(overhaul)+0.4K(bearings)
Prop was overhauled 7 years ago 500SMOH.
Is this normal? ( when inspecting prop and a lot more problem shows up and require an overhaul?) is there anything that IRAN can’t fix?
Or is my service being upgraded without my permission?
I told them “Only do 500AD” when I sent in