The Asheville Regional Airport Traffic Control Tower (ATCT) has relocated from atop the terminal building on the east side of the aerodrome to a standalone structure on the west side of the aerodrome.
Operations from the old ATCT ceased at 2300 local on May 17, 2026. Operations from the new ATCT began at 0630 local on May 18, 2026.
Make sure when you buzz the tower, you use the right one.
Operations from the old ATCT ceased at 2300 local on May 17, 2026. Operations from the new ATCT began at 0630 local on May 18, 2026.
Make sure when you buzz the tower, you use the right one.