- Joined
- Jul 29, 2011
- Messages
- 1,466
- Display Name
- MountainDude
- Home Airfield
- KPDX
I saw their display model at Oshkosh. It was impressive, in a bad way. The gaps and joints looked like a kid built the plane with hands.
I won't drop dime on anyone to the Feds but a rather large kitplane / LSA operation in Ohio once told me that my "51% portion" of a Titan Tornado build I was talking to him about would be handing him tools and manning the grill, so...FAA has changed what major portion means.
In the past, it meant that the builder did 51% or more of ALL the labor.
Now, it means 51% of the tasks. So if you build one rib, you have done the task of building ribs. The company can make the rest of them.
This how several companies are doing very quick builds with only a couple of weeks of the "builder's" time,
Ford built the Pinto and people still buy them.Uncle built one. One of the ugliest planes around. Don't know much about the current company but Jim bede was a notorious dirtbag. Enough for me to be turned off with anything using his name.
Edit: apologies if anyone takes offense to the above. I'm 4 very strong old fashioned's deep.
Are we talking about the looks department or are we talking Jim Bede business man?Ford built the Pinto and people still buy them.
The BD-5 has nothing in common with the BD-4.
If you are going to hold mistakes against a company they you will never by another thing ever.
ALso the Whittman W-8(10?) looks just like a BD-4... no one seems to mind that.
Isn't that the current Boeing motto?Over promise. Under engineer. Wash. Rinse. Repeat