Badger
Pattern Altitude
- Joined
- Dec 29, 2011
- Messages
- 2,136
- Display Name
- Badger
- Home Airfield
- KMSN
Last weekend I am flying American Airlines from Dallas to Bahamas. The flight is oversold and they are offering $800 per seat plus hotel, food etc. to give up seats (they needed 8). As I sit down I see this plastic thing bolted on the middle seat in my row. See PIC. OK I can't hold back anymore, so eventually I ask the flight attendant what this is all about.
Her version:
Management is trying to save money. The 737 has a 161 seat capacity which under FAA rules requires 4 flight attendants - 1 per 50 seats (maybe she said passengers). By installing 11 of these plastic things, they reduced the capacity to 150 and thus only need 3 attendants instead of 4. She said this all started about a month ago.
Can anyone explain the thinking of AA management? My rough figures: flight attendant salary $60,000 plus overhead, lets use $100,000/year for AA cost for flight attendant.
Of course these flights will be below capacity much of the time, but by losing 11 seats at say $600 per ticketed passenger, that's $6,600 per flight. After 15 flights at capacity of 161, they would have more than made the $100,000 employee cost.
This doesn't add up with my math.
(click on pic to see larger version)

Her version:
Management is trying to save money. The 737 has a 161 seat capacity which under FAA rules requires 4 flight attendants - 1 per 50 seats (maybe she said passengers). By installing 11 of these plastic things, they reduced the capacity to 150 and thus only need 3 attendants instead of 4. She said this all started about a month ago.
Can anyone explain the thinking of AA management? My rough figures: flight attendant salary $60,000 plus overhead, lets use $100,000/year for AA cost for flight attendant.
Of course these flights will be below capacity much of the time, but by losing 11 seats at say $600 per ticketed passenger, that's $6,600 per flight. After 15 flights at capacity of 161, they would have more than made the $100,000 employee cost.
This doesn't add up with my math.
(click on pic to see larger version)

Last edited:



...