Yeah, it will be closed from May 26th thru The 29th for repaving. The beginning of the summer season seems like a strange time,
but it is what they are doing. Over 8000 feet of runway in 3 to 4 days... We'll see...
No flyin beach time during that time

but it is what they are doing. Over 8000 feet of runway in 3 to 4 days... We'll see...
No flyin beach time during that time
