Allright. All done.
FIRST. Once I decided to get this done, I stopped running the equipment. Not going to clean the pool / water if I am dumping So it got nasty.
But here are the before and after.
View attachment 152010
View attachment 152009
View attachment 152011
Plaster was worn, chipping, discolored and going on 22 years old.
They came out and chipped away the worst portions of it, grinded bad sections down, washed it, added a bonding agent, and applied the new plaster.
They also replaced a bunch of cracked tiles and some of the coping that was really badly cracked.
View attachment 152012
View attachment 152013
View attachment 152014
My thoughts. This might sort of be the MAACO of pool resurfacing. They didn't grind 100% of it down to the cement, just the really rough parts.
I only had them replace the coping that was badly cracked form the last freeze and I didn't have them replace all of the tiles so there is some subtle variation you can only see if you are looking for it.
I needed it to be functional for my son's graduation party this month. After pool season, I need to have the rest of the coping replaced so it matches and the mastic should also be replaced as it is getting a little old.
The contractor said this plaster should be good for around 15 years. I really like the way it turned out.
I think it cost around $12k and I am sure my water bill will be another grand (guessing. no idea). It took 32 hours with the hose on full to fill it.
I have to add about 400 lbs of salt and 10 gallons of acid, let it run 24/7 for about 10 days then be back to just maintaining it and cussing at it the way God intended.
Glad to be done with this. It's long over due.
Oh all in all, it was 2 days of prep and 1 day for the plaster. They knocked this out FAST!