Clark1961
Touchdown! Greaser!
- Joined
- Jun 7, 2008
- Messages
- 17,737
- Display Name
- Display name:
When you said; "point of design weakness" it's one of those engineer-speak terms that non-engineers use to deflect blame from the operator, like the ham-footed pilot.
I disagree entirely. It has nothing to do with blame and has everything to do with an evaluation of a design. Every design has points of weakness. It can be helpful to acknowledge what those points are. Saying the operator shouldn't do something is fine. Refusing to acknowledge a structure's weak point is not so fine. Refusing to discuss a structure's weak points might border on negligence depending on application.
One extreme example of the level of analysis of a problem is the age-old argument between metallurgist and engineer. The metallurgist says "it broke here because of this inclusion or that crystal structure and the engineer says that it broke because they pulled too hard on it. In other words, the part was in spec but the load was out of spec.
In order to improve the design we have to know whether we exceeded the limits or whether the materials were bad. If we exceeded the limits then we have to build it stronger or prevent exceeding the limits (or some combination).