    Looking for ballpark prices, per sf for a metal structure on concrete.
    Electricity & overhead LEDs.
    Electric bifold.
    No insulation, no plumbing, no interior finishing; bare building.
    Any reports in the 2500-10000sf range would help.
    So many possible variations- try not to overthink it, shoot out a number
    Materials & labor.
     
  2. TCABM

    TCABM En-Route

    Joined:
    Apr 23, 2013
    Messages:
    4,016

    Display name:
    3G
    Mueller Steel buildings will do a 60x40 for about a buck and a quarter depending how far they have to travel.
     
    Let'sgoflying! likes this.
  3. Randomskylane

    Randomskylane Pre-takeoff checklist

    Joined:
    Jun 2, 2021
    Messages:
    324

    Display name:
    Randomskylane
    Sprinkler required by local government?

    What are electric requirements per local regs?

    level concrete slab which conforms to local standards? What about drainage (storm water, hundred year floods)

    is this at public airfield or extra space at your house or on private property or ?

    legal use wherever it goes? I knew someone who needed a traffic plan (ridiculous money just for a study nevermind a plan) because she wanted to teach at her house
     
  4. JVerb

    JVerb Pre-Flight

    Joined:
    Nov 8, 2020
    Messages:
    50

    Display name:
    JVerb
    Wind loading requirements (impacts the building member sizes) and site prep are going to be your biggest unknowns in your pricing. Figure that out , then go to a prefab builders site and ask. They'll quote you buildings all day long.
     
  5. USAF JD

    USAF JD Pre-takeoff checklist

    Joined:
    Nov 2, 2011
    Messages:
    124
    Location:
    Crystal Lake

    Display name:
    Jeff
    I was just quoted in WI...Ending up in a used one at half the cost.
    50 x 50 x 12 Metal building 90K
    Concrete 20K
    Excavating and site prep 5K
    Apron 5-8K
     
    Let'sgoflying! likes this.
  6. Mtns2Skies

    Mtns2Skies Final Approach

    Joined:
    Jul 12, 2008
    Messages:
    5,291
    Location:
    Wisconsin

    Display name:
    Mtns2Skies
    Literally exact same situation in Southern WI. We had:

    50x50x12 Wood building - 105k
    Concrete 25k
    Excavating 5k
    Apron (included in concrete)
    Hangar door 15k
    Hangar door install 5k
    Total: ~155k

    Ended up buying one for significantly less.
     
    Let'sgoflying! likes this.